5 Job details 5Tawzeef
Details
م
Job opportunity مجموعة طيران الإمارات (Emirates Group)

Production Planning Engineer - III

Emirates 2026-11-19
Job typeNot specified
Field or rolePlanning Engineer

Job description

Job Purpose Emirates Engineering is one of the world's most technologically advanced aircraft maintenance facilities

Key Responsibilities

  • III you will takes ownership of the Production Planning process for the assigned area: Work Package Preparation، Estimation، Dock Control، Workshop or Check Planning
  • Preparation & Closure Manage the technical review of all tasks which could be called up by Maintenance Planning to ensure the following is identified: task intent، special
  • Ensure required MQ adjustment based on known component/tasks plans and duplicated materials pre-input
  • Ensure 100% of tasks are audited prior to the CRS and ensure the work package closure is done in UM as per agreed SLAs
  • Create or review and approve Maintenance facilitation tasks to support the planned maintenance execution
  • Provide daily reports to highlight the check progress in terms of tasks، manpower and material cost
  • Ensure fleet-wise database for Task Estimation is up to date with step wise details for man-hours and highlights impacting production workflow plan for both Routine & Non-Routine tasks
  • Study first time and complex maintenance tasks and modifications through liaising with production LAEs and observing the same in action as required to determine the accurate man-hour per trade per critical steps Create `Facilitation Cards` as per work package requirement as well as per necessity of Production in terms of facility/check activity to support the planned maintenance execution
  • Provide daily reports to highlight the check or workload progress in terms of wo/tasks and manpower
  • GCAA/EASA Type Licence on EK fleet Type Experience in Aircraft Maintenance related activities or Production Planning at an airline or 3rd party Maintenance Facility
  • in travel، tourism، leisure، aviation، sport and retail
  • reflect our passion for innovation
  • Manage the technical review of all tasks which could be called up by Maintenance Planning to ensure the following is identified: task intent، special
  • Ensure required MQ adjustment based on known component/tasks plans and duplicated materials pre-input.
  • Ensure 100% of tasks are audited prior to the CRS and ensure the work package closure is done in UM as per agreed SLAs.
  • Create or review and approve Maintenance facilitation tasks to support the planned maintenance execution.
  • Ensure fleet-wise database for Task Estimation is up to date with step wise details for man-hours and highlights impacting production workflow plan for both Routine & Non-Routine tasks.
  • Study first time and complex maintenance tasks and modifications through liaising with production LAEs and observing the same in action as required to determine the accurate man-hour per trade per critical steps
  • GCAA/EASA Type Licence on EK fleet Type

Requirements & Qualifications

  • Demonstrate aircraft/components technical skills to conduct technical review of work packages (Up to A checks، LG changes and ad hoc maintenance inputs)، produce work package estimations and produce check or workshop plans
  • Knowledge of ULTRAMAIN is an advantage Excellent people management skills
  • Excellent people management skills.

Benefits & Conditions

  • Salary & benefits Join us in Dubai and enjoy an attractive tax-free salary and travel benefits that are exclusive to our industry، including discounts on flights and hotels stays around the world
  • You can find out more information about our employee benefits in the Working Here section of our website
  • Salary & benefits
  • Join us in Dubai and enjoy an attractive tax-free salary and travel benefits that are exclusive to our industry، including discounts on flights and hotels stays around the world

We are GCAA CAR V approved، and support the world’s largest fleet of Airbus and Boeing aircraft، operated by Emirates

We also support the fleets of thirty other airlines through third-party maintenance contracts

Our exceptional team sets industry benchmarks

All Emirates Engineering personnel are fully qualified at all levels

They manage and implement all aspects of maintenance، engineering، quality، planning and logistics

Our diligence is uncompromising، our commitment to quality and superior levels of safety is unwavering

And this has established our reputation for world-leading aircraft maintenance

As Production Planning Engineer

Constantly revise plans based on findings during execution to ensure they are delivered on the agreed budgets and targets

Engage with different stakeholders in Engineering organization as required to drive and deliver the expected Production Planning services

Provide leadership and guidance to their assigned team and actively participate in projects to improve the PPC process and deliverables

In this role you will: Provide leadership and guidance to the planning officers and supervisors reporting to him/her

Lead assigned projects to continuously improve the Production Planning Department and improve the service provided to Operations

Continuously review with PPEs within other PPC areas for cross utilization of resources

(jacking، defueling، repairs، shop input، test flights etc.) dependencies، materials required، tooling required، new supporting task cards required and any other information which will aid the planning process

Ensure all issues identified as part of the technical review process are followed up with the concerned departments and resolved prior to the start of each input

Manage all materials and tools that need to be available for the planned inputs in Base Maintenance

Ensure the work package for each input is printed، segregated and complete as per agreed SLAs and quality standards prior to each maintenance input

Manage the work package closure auditing process to ensure the team is adhering to the defined WIs and auditing standards

Ensure Co-Ordination with 3rd Parties or any internal department (like workshops/GSE/Docking/ETS) to alert them to the work that will be assigned to them based on published workflow plans for each input

Dock Control Manage the daily allocation of work to Production in conjunction with the Shift Manager and Resource planning team

Ensuring all tools، materials and resources are available to deliver the planned work and monitor resources to ensure the check is delivered within the given MH and material budgets

Maintain the Check workflow plan to ensure it reflects the current check progress and planned finish date

Revise workflow plans as required to reflect critical findings and their impact on the critical path

Ensure that any threat or lag in the progress of the check is highlighted in time so mitigation measures can be adopted

Review Non-Routine Findings to identify critical ones that may have an impact on the critical path، MH budget & the key milestones of the check

Ensure there is a plan in place for these critical NRIs

Oversee the audit of completed check work packs/cards and ensure the CRS is only released to production on confirmation all cards have been completed or deferred in accordance with the EPM

Provide progressive/ post check information to ensure an efficient and effective feedback process exists to all concerned stakeholders

Ensure reasons for deviation to plans and budget are understood and explained

Act as key focal for all planning issues between operations and all other stakeholders during check execution including: FTM، Repairs Process، SDG، Aircraft Scheduling، Logistics، Facilities، Workshops، etc

Check Planning Conduct a work pack review of maintenance events، to ensure the following is identified: task intent، special

Develop a detailed daily workload plan and analyse the same with concerned production teams to ensure effective workload balancing

Ensure minimum ground time is identified & planned for each maintenance input

Lead the daily Review Meetings to discuss the upcoming packages/inputs and finalize the daily check plan

Ensure agreement from all stakeholders on the accomplishment plan

Ensure all issues identified during these reviews are followed up and addressed before input

Estimation Produce detailed Man-hours estimate report for each input ensuring correctness and accuracy to support the workflow and manpower planning process

Post each completed input review the man-hour analysis for correctness and accuracy to ensure technical integrity of the estimation database through continuous study of production performance in terms of clocking/ man-hour utilization

Review engagement standards based on latest actual events، to forecast and prepare yearly man-hour budget for maintenance inputs

Review fleet-wise defect analysis and trend monitoring to determine technical impact for future layovers in terms of Non-Routine estimation and manpower allocation taking into consideration check type، age، and in service issues

Workshop Provide guidance in the daily allocation of work to Production in conjunction with the Shift Manager/Shop Focal in order to meet the workflow milestones and targets

Ensure all tools، materials are available to deliver the planned work and monitor resources to ensure the workload is delivered within the given MH budget

Ensure that any threat or lag in the progress of the workload is highlighted in time so mitigation measures can be adopted

Maintain the C Check workflow plans

Ensure it adapts to check or workload finding and impact on the critical path affected

Liaise with the Dock PPE / MSM or Workshop Manager and publish an agreed recovery plan

Ensure there is a plan in place for critical findings، that may impact parts release

Ensure all EER?s are reflected in the ETS dashboard and make necessary follow ups to get the EER responses on time

Provide estimation support to the production organisation ensuring a detailed understanding exists of the resources required to accomplish any maintenance activity

Ensure this database is updated regularly

Produce the annual manhour budget for the business، based on projected workloads and other business drivers

Ensure this is reviewed monthly to allow effective demand/ resource planning

Qualification To be considered for this role، you should meet the below

Bachelors in Engineering (Aeronautical، Mechanical or Electrical) or Engineering Licence

Good knowledge of aircraft systems، power plant and components

Thorough understanding of Aircraft Regulatory

and Aircraft Maintenance documents

Knowledge of MS Office applications i.e

Word، Excel and PowerPoint

Join our team of over 100، 000 people and follow your passions into one of over 50 brands in the Emirates Group

We’re led by our world-famous airline، Emirates، and our global air services provider، dnata

All our leading brands

We strive for exceptionally high standards in all the products and services we offer and we’ve built an admired global reputation because of it

Work with us to build exciting brands and progress your career in the Emirates Group

Further information on what’s it like to live and work in our cosmopolitan home city، can be found in the Dubai Lifestyle section.

Job Purpose

Emirates Engineering is one of the world's most technologically advanced aircraft maintenance facilities.

We also support the fleets of thirty other airlines through third-party maintenance contracts.

They manage and implement all aspects of maintenance، engineering، quality، planning and logistics.

And this has established our reputation for world-leading aircraft maintenance.

Provide leadership and guidance to their assigned team and actively participate in projects to improve the PPC process and deliverables.

In this role you will

Provide leadership and guidance to the planning officers and supervisors reporting to him/her.

Lead assigned projects to continuously improve the Production Planning Department and improve the service provided to Operations.

Continuously review with PPEs within other PPC areas for cross utilization of resources.

Preparation & Closure

Ensure all issues identified as part of the technical review process are followed up with the concerned departments and resolved prior to the start of each input.

Ensure the work package for each input is printed، segregated and complete as per agreed SLAs and quality standards prior to each maintenance input.

Ensure Co-Ordination with 3rd Parties or any internal department (like workshops/GSE/Docking/ETS) to alert them to the work that will be assigned to them based on published workflow plans for each input.

Dock Control

Manage the daily allocation of work to Production in conjunction with the Shift Manager and Resource planning team

Ensuring all tools، materials and resources are available to deliver the planned work and monitor resources to ensure the check is delivered within the given MH and material budgets.

Revise workflow plans as required to reflect critical findings and their impact on the critical path.

Ensure that any threat or lag in the progress of the check is highlighted in time so mitigation measures can be adopted.

Ensure there is a plan in place for these critical NRIs.

Oversee the audit of completed check work packs/cards and ensure the CRS is only released to production on confirmation all cards have been completed or deferred in accordance with the EPM.

Ensure reasons for deviation to plans and budget are understood and explained.

Act as key focal for all planning issues between operations and all other stakeholders during check execution including: FTM، Repairs Process، SDG، Aircraft Scheduling، Logistics، Facilities، Workshops، etc.

Check Planning

Conduct a work pack review of maintenance events، to ensure the following is identified: task intent، special

(jacking، defueling، repairs، shop input، test flights etc.) dependencies، materials required، tooling required، new supporting task cards required and any other information which will aid the planning process.

Ensure minimum ground time is identified & planned for each maintenance input.

Ensure all issues identified during these reviews are followed up and addressed before input.

Estimation

Produce detailed Man-hours estimate report for each input ensuring correctness and accuracy to support the workflow and manpower planning process.

Post each completed input review the man-hour analysis for correctness and accuracy to ensure technical integrity of the estimation database through continuous study of production performance in terms of clocking/ man-hour utilization.

Create `Facilitation Cards` as per work package requirement as well as per necessity of Production in terms of facility/check activity to support the planned maintenance execution.

Review engagement standards based on latest actual events، to forecast and prepare yearly man-hour budget for maintenance inputs.

Review fleet-wise defect analysis and trend monitoring to determine technical impact for future layovers in terms of Non-Routine estimation and manpower allocation taking into consideration check type، age، and in service issues.

Workshop

Provide guidance in the daily allocation of work to Production in conjunction with the Shift Manager/Shop Focal in order to meet the workflow milestones and targets

Ensure all tools، materials are available to deliver the planned work and monitor resources to ensure the workload is delivered within the given MH budget.

Ensure that any threat or lag in the progress of the workload is highlighted in time so mitigation measures can be adopted.

Liaise with the Dock PPE / MSM or Workshop Manager and publish an agreed recovery plan.

Ensure all EER?s are reflected in the ETS dashboard and make necessary follow ups to get the EER responses on time.

Ensure this database is updated regularly.

Ensure this is reviewed monthly to allow effective demand/ resource planning.

Qualification

To be considered for this role، you should meet the below

Experience in Aircraft Maintenance related activities or Production Planning at an airline or 3rd party Maintenance Facility.

Good knowledge of aircraft systems، power plant and components.

and Aircraft Maintenance documents.

Knowledge of MS Office applications i.e. Word، Excel and PowerPoint.

Knowledge of ULTRAMAIN is an advantage

Join our team of over 100، 000 people and follow your passions into one of over 50 brands in the Emirates Group.

We’re led by our world-famous airline، Emirates، and our global air services provider، dnata. All our leading brands

We strive for exceptionally high standards in all the products and services we offer and we’ve built an admired global reputation because of it.

Work with us to build exciting brands and progress your career in the Emirates Group.

Other jobs
Apply and contact Contact methods available in this listing

You can connect directly with the employer via the verified options below or via quick apply.

Before applyingThree checks for a stronger application
Updated resume Correct contact details A short job-specific message
Job match details
Your match with this jobMedium match; review skills and gaps before applying.
57%
Listing is clear and comprehensive.Opportunity is highly fresh and active. Use category/role filters to improve results.
م
Company snapshotمجموعة طيران الإمارات (Emirates Group)Emirates
Trusted
Career advice

Advice before applying

How to Write a Professional CV for Gulf JobsA practical guide to preparing a CV for jobs in Saudi Arabia, Qatar, UAE, and the Gulf market.
How to Answer: Tell Me About YourselfA simple structure to answer the most common interview question confidently.
Best WhatsApp Message for Job ApplicationsA professional short message structure for applying to jobs through WhatsApp.
FAQ

Important questions before applying

How can I apply for Production Planning Engineer - III?

Review the job details, then use the available apply or contact button on the job page.

Where is this job located?

The job location is Emirates.

Is the salary listed?

The salary is not listed in the ad. You can ask about it when contacting or applying.

Do I need an account to apply?

An account helps you save jobs, track application status, and update your resume easily.

Report this listingUse this form if the listing is inaccurate, misleading, or contains inappropriate content.
Report
Add the app to your home screenFaster access to jobs with one tap.
5Tawzeef · Listing details

Production Planning Engineer - III

مجموعة طيران الإمارات (Emirates Group)

LocationEmirates
Salary-
Employment typeNot specified
Openings1
Posted at2026-11-19
CategoryPlanning Engineer

Job description

Job Purpose Emirates Engineering is one of the world's most technologically advanced aircraft maintenance facilities

Key Responsibilities

  • III you will takes ownership of the Production Planning process for the assigned area: Work Package Preparation، Estimation، Dock Control، Workshop or Check Planning
  • Preparation & Closure Manage the technical review of all tasks which could be called up by Maintenance Planning to ensure the following is identified: task intent، special
  • Ensure required MQ adjustment based on known component/tasks plans and duplicated materials pre-input
  • Ensure 100% of tasks are audited prior to the CRS and ensure the work package closure is done in UM as per agreed SLAs
  • Create or review and approve Maintenance facilitation tasks to support the planned maintenance execution
  • Provide daily reports to highlight the check progress in terms of tasks، manpower and material cost
  • Ensure fleet-wise database for Task Estimation is up to date with step wise details for man-hours and highlights impacting production workflow plan for both Routine & Non-Routine tasks
  • Study first time and complex maintenance tasks and modifications through liaising with production LAEs and observing the same in action as required to determine the accurate man-hour per trade per critical steps Create `Facilitation Cards` as per work package requirement as well as per necessity of Production in terms of facility/check activity to support the planned maintenance execution
  • Provide daily reports to highlight the check or workload progress in terms of wo/tasks and manpower
  • GCAA/EASA Type Licence on EK fleet Type Experience in Aircraft Maintenance related activities or Production Planning at an airline or 3rd party Maintenance Facility
  • in travel، tourism، leisure، aviation، sport and retail
  • reflect our passion for innovation
  • Manage the technical review of all tasks which could be called up by Maintenance Planning to ensure the following is identified: task intent، special
  • Ensure required MQ adjustment based on known component/tasks plans and duplicated materials pre-input.
  • Ensure 100% of tasks are audited prior to the CRS and ensure the work package closure is done in UM as per agreed SLAs.
  • Create or review and approve Maintenance facilitation tasks to support the planned maintenance execution.
  • Ensure fleet-wise database for Task Estimation is up to date with step wise details for man-hours and highlights impacting production workflow plan for both Routine & Non-Routine tasks.
  • Study first time and complex maintenance tasks and modifications through liaising with production LAEs and observing the same in action as required to determine the accurate man-hour per trade per critical steps
  • GCAA/EASA Type Licence on EK fleet Type

Requirements & Qualifications

  • Demonstrate aircraft/components technical skills to conduct technical review of work packages (Up to A checks، LG changes and ad hoc maintenance inputs)، produce work package estimations and produce check or workshop plans
  • Knowledge of ULTRAMAIN is an advantage Excellent people management skills
  • Excellent people management skills.

Benefits & Conditions

  • Salary & benefits Join us in Dubai and enjoy an attractive tax-free salary and travel benefits that are exclusive to our industry، including discounts on flights and hotels stays around the world
  • You can find out more information about our employee benefits in the Working Here section of our website
  • Salary & benefits
  • Join us in Dubai and enjoy an attractive tax-free salary and travel benefits that are exclusive to our industry، including discounts on flights and hotels stays around the world

We are GCAA CAR V approved، and support the world’s largest fleet of Airbus and Boeing aircraft، operated by Emirates

We also support the fleets of thirty other airlines through third-party maintenance contracts

Our exceptional team sets industry benchmarks

All Emirates Engineering personnel are fully qualified at all levels

They manage and implement all aspects of maintenance، engineering، quality، planning and logistics

Our diligence is uncompromising، our commitment to quality and superior levels of safety is unwavering

And this has established our reputation for world-leading aircraft maintenance

As Production Planning Engineer

Constantly revise plans based on findings during execution to ensure they are delivered on the agreed budgets and targets

Engage with different stakeholders in Engineering organization as required to drive and deliver the expected Production Planning services

Provide leadership and guidance to their assigned team and actively participate in projects to improve the PPC process and deliverables

In this role you will: Provide leadership and guidance to the planning officers and supervisors reporting to him/her

Lead assigned projects to continuously improve the Production Planning Department and improve the service provided to Operations

Continuously review with PPEs within other PPC areas for cross utilization of resources

(jacking، defueling، repairs، shop input، test flights etc.) dependencies، materials required، tooling required، new supporting task cards required and any other information which will aid the planning process

Ensure all issues identified as part of the technical review process are followed up with the concerned departments and resolved prior to the start of each input

Manage all materials and tools that need to be available for the planned inputs in Base Maintenance

Ensure the work package for each input is printed، segregated and complete as per agreed SLAs and quality standards prior to each maintenance input

Manage the work package closure auditing process to ensure the team is adhering to the defined WIs and auditing standards

Ensure Co-Ordination with 3rd Parties or any internal department (like workshops/GSE/Docking/ETS) to alert them to the work that will be assigned to them based on published workflow plans for each input

Dock Control Manage the daily allocation of work to Production in conjunction with the Shift Manager and Resource planning team

Ensuring all tools، materials and resources are available to deliver the planned work and monitor resources to ensure the check is delivered within the given MH and material budgets

Maintain the Check workflow plan to ensure it reflects the current check progress and planned finish date

Revise workflow plans as required to reflect critical findings and their impact on the critical path

Ensure that any threat or lag in the progress of the check is highlighted in time so mitigation measures can be adopted

Review Non-Routine Findings to identify critical ones that may have an impact on the critical path، MH budget & the key milestones of the check

Ensure there is a plan in place for these critical NRIs

Oversee the audit of completed check work packs/cards and ensure the CRS is only released to production on confirmation all cards have been completed or deferred in accordance with the EPM

Provide progressive/ post check information to ensure an efficient and effective feedback process exists to all concerned stakeholders

Ensure reasons for deviation to plans and budget are understood and explained

Act as key focal for all planning issues between operations and all other stakeholders during check execution including: FTM، Repairs Process، SDG، Aircraft Scheduling، Logistics، Facilities، Workshops، etc

Check Planning Conduct a work pack review of maintenance events، to ensure the following is identified: task intent، special

Develop a detailed daily workload plan and analyse the same with concerned production teams to ensure effective workload balancing

Ensure minimum ground time is identified & planned for each maintenance input

Lead the daily Review Meetings to discuss the upcoming packages/inputs and finalize the daily check plan

Ensure agreement from all stakeholders on the accomplishment plan

Ensure all issues identified during these reviews are followed up and addressed before input

Estimation Produce detailed Man-hours estimate report for each input ensuring correctness and accuracy to support the workflow and manpower planning process

Post each completed input review the man-hour analysis for correctness and accuracy to ensure technical integrity of the estimation database through continuous study of production performance in terms of clocking/ man-hour utilization

Review engagement standards based on latest actual events، to forecast and prepare yearly man-hour budget for maintenance inputs

Review fleet-wise defect analysis and trend monitoring to determine technical impact for future layovers in terms of Non-Routine estimation and manpower allocation taking into consideration check type، age، and in service issues

Workshop Provide guidance in the daily allocation of work to Production in conjunction with the Shift Manager/Shop Focal in order to meet the workflow milestones and targets

Ensure all tools، materials are available to deliver the planned work and monitor resources to ensure the workload is delivered within the given MH budget

Ensure that any threat or lag in the progress of the workload is highlighted in time so mitigation measures can be adopted

Maintain the C Check workflow plans

Ensure it adapts to check or workload finding and impact on the critical path affected

Liaise with the Dock PPE / MSM or Workshop Manager and publish an agreed recovery plan

Ensure there is a plan in place for critical findings، that may impact parts release

Ensure all EER?s are reflected in the ETS dashboard and make necessary follow ups to get the EER responses on time

Provide estimation support to the production organisation ensuring a detailed understanding exists of the resources required to accomplish any maintenance activity

Ensure this database is updated regularly

Produce the annual manhour budget for the business، based on projected workloads and other business drivers

Ensure this is reviewed monthly to allow effective demand/ resource planning

Qualification To be considered for this role، you should meet the below

Bachelors in Engineering (Aeronautical، Mechanical or Electrical) or Engineering Licence

Good knowledge of aircraft systems، power plant and components

Thorough understanding of Aircraft Regulatory

and Aircraft Maintenance documents

Knowledge of MS Office applications i.e

Word، Excel and PowerPoint

Join our team of over 100، 000 people and follow your passions into one of over 50 brands in the Emirates Group

We’re led by our world-famous airline، Emirates، and our global air services provider، dnata

All our leading brands

We strive for exceptionally high standards in all the products and services we offer and we’ve built an admired global reputation because of it

Work with us to build exciting brands and progress your career in the Emirates Group

Further information on what’s it like to live and work in our cosmopolitan home city، can be found in the Dubai Lifestyle section.

Job Purpose

Emirates Engineering is one of the world's most technologically advanced aircraft maintenance facilities.

We also support the fleets of thirty other airlines through third-party maintenance contracts.

They manage and implement all aspects of maintenance، engineering، quality، planning and logistics.

And this has established our reputation for world-leading aircraft maintenance.

Provide leadership and guidance to their assigned team and actively participate in projects to improve the PPC process and deliverables.

In this role you will

Provide leadership and guidance to the planning officers and supervisors reporting to him/her.

Lead assigned projects to continuously improve the Production Planning Department and improve the service provided to Operations.

Continuously review with PPEs within other PPC areas for cross utilization of resources.

Preparation & Closure

Ensure all issues identified as part of the technical review process are followed up with the concerned departments and resolved prior to the start of each input.

Ensure the work package for each input is printed، segregated and complete as per agreed SLAs and quality standards prior to each maintenance input.

Ensure Co-Ordination with 3rd Parties or any internal department (like workshops/GSE/Docking/ETS) to alert them to the work that will be assigned to them based on published workflow plans for each input.

Dock Control

Manage the daily allocation of work to Production in conjunction with the Shift Manager and Resource planning team

Ensuring all tools، materials and resources are available to deliver the planned work and monitor resources to ensure the check is delivered within the given MH and material budgets.

Revise workflow plans as required to reflect critical findings and their impact on the critical path.

Ensure that any threat or lag in the progress of the check is highlighted in time so mitigation measures can be adopted.

Ensure there is a plan in place for these critical NRIs.

Oversee the audit of completed check work packs/cards and ensure the CRS is only released to production on confirmation all cards have been completed or deferred in accordance with the EPM.

Ensure reasons for deviation to plans and budget are understood and explained.

Act as key focal for all planning issues between operations and all other stakeholders during check execution including: FTM، Repairs Process، SDG، Aircraft Scheduling، Logistics، Facilities، Workshops، etc.

Check Planning

Conduct a work pack review of maintenance events، to ensure the following is identified: task intent، special

(jacking، defueling، repairs، shop input، test flights etc.) dependencies، materials required، tooling required، new supporting task cards required and any other information which will aid the planning process.

Ensure minimum ground time is identified & planned for each maintenance input.

Ensure all issues identified during these reviews are followed up and addressed before input.

Estimation

Produce detailed Man-hours estimate report for each input ensuring correctness and accuracy to support the workflow and manpower planning process.

Post each completed input review the man-hour analysis for correctness and accuracy to ensure technical integrity of the estimation database through continuous study of production performance in terms of clocking/ man-hour utilization.

Create `Facilitation Cards` as per work package requirement as well as per necessity of Production in terms of facility/check activity to support the planned maintenance execution.

Review engagement standards based on latest actual events، to forecast and prepare yearly man-hour budget for maintenance inputs.

Review fleet-wise defect analysis and trend monitoring to determine technical impact for future layovers in terms of Non-Routine estimation and manpower allocation taking into consideration check type، age، and in service issues.

Workshop

Provide guidance in the daily allocation of work to Production in conjunction with the Shift Manager/Shop Focal in order to meet the workflow milestones and targets

Ensure all tools، materials are available to deliver the planned work and monitor resources to ensure the workload is delivered within the given MH budget.

Ensure that any threat or lag in the progress of the workload is highlighted in time so mitigation measures can be adopted.

Liaise with the Dock PPE / MSM or Workshop Manager and publish an agreed recovery plan.

Ensure all EER?s are reflected in the ETS dashboard and make necessary follow ups to get the EER responses on time.

Ensure this database is updated regularly.

Ensure this is reviewed monthly to allow effective demand/ resource planning.

Qualification

To be considered for this role، you should meet the below

Experience in Aircraft Maintenance related activities or Production Planning at an airline or 3rd party Maintenance Facility.

Good knowledge of aircraft systems، power plant and components.

and Aircraft Maintenance documents.

Knowledge of MS Office applications i.e. Word، Excel and PowerPoint.

Knowledge of ULTRAMAIN is an advantage

Join our team of over 100، 000 people and follow your passions into one of over 50 brands in the Emirates Group.

We’re led by our world-famous airline، Emirates، and our global air services provider، dnata. All our leading brands

We strive for exceptionally high standards in all the products and services we offer and we’ve built an admired global reputation because of it.

Work with us to build exciting brands and progress your career in the Emirates Group.

Application and contact

External application linkhttps://www.emiratesgroupcareers.com/search-and-apply/27312
Listing URL: https://5tawzeef.com/en/job/2050444/production-planning-engineer-iii
Printed at: 2026-11-19 14:04
Job opportunity

Production Planning Engineer - III

مجموعة طيران الإمارات (Emirates Group) Planning Engineer
LocationEmirates
Job typeFull time
Posted2026-11-19
Openings1
SalaryNegotiable

Choose an available application or contact method.

Quick fitEmiratesStart with location and job type before the long description.
Trust & clarityمجموعة طيران الإمارات (Emirates Group)Company and contact data follow visibility permissions.
Next actionApply nowThe apply action stays clear with no adjacent ads.
LocationEmirates
Salary-
Openings1
Posted at2026-11-19
Job overview

Job description

Read the job details and requirements before sending your application.

Job Purpose Emirates Engineering is one of the world's most technologically advanced aircraft maintenance facilities

Key Responsibilities

  • III you will takes ownership of the Production Planning process for the assigned area: Work Package Preparation، Estimation، Dock Control، Workshop or Check Planning
  • Preparation & Closure Manage the technical review of all tasks which could be called up by Maintenance Planning to ensure the following is identified: task intent، special
  • Ensure required MQ adjustment based on known component/tasks plans and duplicated materials pre-input
  • Ensure 100% of tasks are audited prior to the CRS and ensure the work package closure is done in UM as per agreed SLAs
  • Create or review and approve Maintenance facilitation tasks to support the planned maintenance execution
  • Provide daily reports to highlight the check progress in terms of tasks، manpower and material cost
  • Ensure fleet-wise database for Task Estimation is up to date with step wise details for man-hours and highlights impacting production workflow plan for both Routine & Non-Routine tasks
  • Study first time and complex maintenance tasks and modifications through liaising with production LAEs and observing the same in action as required to determine the accurate man-hour per trade per critical steps Create `Facilitation Cards` as per work package requirement as well as per necessity of Production in terms of facility/check activity to support the planned maintenance execution
  • Provide daily reports to highlight the check or workload progress in terms of wo/tasks and manpower
  • GCAA/EASA Type Licence on EK fleet Type Experience in Aircraft Maintenance related activities or Production Planning at an airline or 3rd party Maintenance Facility
  • in travel، tourism، leisure، aviation، sport and retail
  • reflect our passion for innovation
  • Manage the technical review of all tasks which could be called up by Maintenance Planning to ensure the following is identified: task intent، special
  • Ensure required MQ adjustment based on known component/tasks plans and duplicated materials pre-input.
  • Ensure 100% of tasks are audited prior to the CRS and ensure the work package closure is done in UM as per agreed SLAs.
  • Create or review and approve Maintenance facilitation tasks to support the planned maintenance execution.
  • Ensure fleet-wise database for Task Estimation is up to date with step wise details for man-hours and highlights impacting production workflow plan for both Routine & Non-Routine tasks.
  • Study first time and complex maintenance tasks and modifications through liaising with production LAEs and observing the same in action as required to determine the accurate man-hour per trade per critical steps
  • GCAA/EASA Type Licence on EK fleet Type

Requirements & Qualifications

  • Demonstrate aircraft/components technical skills to conduct technical review of work packages (Up to A checks، LG changes and ad hoc maintenance inputs)، produce work package estimations and produce check or workshop plans
  • Knowledge of ULTRAMAIN is an advantage Excellent people management skills
  • Excellent people management skills.

Benefits & Conditions

  • Salary & benefits Join us in Dubai and enjoy an attractive tax-free salary and travel benefits that are exclusive to our industry، including discounts on flights and hotels stays around the world
  • You can find out more information about our employee benefits in the Working Here section of our website
  • Salary & benefits
  • Join us in Dubai and enjoy an attractive tax-free salary and travel benefits that are exclusive to our industry، including discounts on flights and hotels stays around the world

We are GCAA CAR V approved، and support the world’s largest fleet of Airbus and Boeing aircraft، operated by Emirates

We also support the fleets of thirty other airlines through third-party maintenance contracts

Our exceptional team sets industry benchmarks

All Emirates Engineering personnel are fully qualified at all levels

They manage and implement all aspects of maintenance، engineering، quality، planning and logistics

Our diligence is uncompromising، our commitment to quality and superior levels of safety is unwavering

And this has established our reputation for world-leading aircraft maintenance

As Production Planning Engineer

Constantly revise plans based on findings during execution to ensure they are delivered on the agreed budgets and targets

Engage with different stakeholders in Engineering organization as required to drive and deliver the expected Production Planning services

Provide leadership and guidance to their assigned team and actively participate in projects to improve the PPC process and deliverables

In this role you will: Provide leadership and guidance to the planning officers and supervisors reporting to him/her

Lead assigned projects to continuously improve the Production Planning Department and improve the service provided to Operations

Continuously review with PPEs within other PPC areas for cross utilization of resources

(jacking، defueling، repairs، shop input، test flights etc.) dependencies، materials required، tooling required، new supporting task cards required and any other information which will aid the planning process

Ensure all issues identified as part of the technical review process are followed up with the concerned departments and resolved prior to the start of each input

Manage all materials and tools that need to be available for the planned inputs in Base Maintenance

Ensure the work package for each input is printed، segregated and complete as per agreed SLAs and quality standards prior to each maintenance input

Manage the work package closure auditing process to ensure the team is adhering to the defined WIs and auditing standards

Ensure Co-Ordination with 3rd Parties or any internal department (like workshops/GSE/Docking/ETS) to alert them to the work that will be assigned to them based on published workflow plans for each input

Dock Control Manage the daily allocation of work to Production in conjunction with the Shift Manager and Resource planning team

Ensuring all tools، materials and resources are available to deliver the planned work and monitor resources to ensure the check is delivered within the given MH and material budgets

Maintain the Check workflow plan to ensure it reflects the current check progress and planned finish date

Revise workflow plans as required to reflect critical findings and their impact on the critical path

Ensure that any threat or lag in the progress of the check is highlighted in time so mitigation measures can be adopted

Review Non-Routine Findings to identify critical ones that may have an impact on the critical path، MH budget & the key milestones of the check

Ensure there is a plan in place for these critical NRIs

Oversee the audit of completed check work packs/cards and ensure the CRS is only released to production on confirmation all cards have been completed or deferred in accordance with the EPM

Provide progressive/ post check information to ensure an efficient and effective feedback process exists to all concerned stakeholders

Ensure reasons for deviation to plans and budget are understood and explained

Act as key focal for all planning issues between operations and all other stakeholders during check execution including: FTM، Repairs Process، SDG، Aircraft Scheduling، Logistics، Facilities، Workshops، etc

Check Planning Conduct a work pack review of maintenance events، to ensure the following is identified: task intent، special

Develop a detailed daily workload plan and analyse the same with concerned production teams to ensure effective workload balancing

Ensure minimum ground time is identified & planned for each maintenance input

Lead the daily Review Meetings to discuss the upcoming packages/inputs and finalize the daily check plan

Ensure agreement from all stakeholders on the accomplishment plan

Ensure all issues identified during these reviews are followed up and addressed before input

Estimation Produce detailed Man-hours estimate report for each input ensuring correctness and accuracy to support the workflow and manpower planning process

Post each completed input review the man-hour analysis for correctness and accuracy to ensure technical integrity of the estimation database through continuous study of production performance in terms of clocking/ man-hour utilization

Review engagement standards based on latest actual events، to forecast and prepare yearly man-hour budget for maintenance inputs

Review fleet-wise defect analysis and trend monitoring to determine technical impact for future layovers in terms of Non-Routine estimation and manpower allocation taking into consideration check type، age، and in service issues

Workshop Provide guidance in the daily allocation of work to Production in conjunction with the Shift Manager/Shop Focal in order to meet the workflow milestones and targets

Ensure all tools، materials are available to deliver the planned work and monitor resources to ensure the workload is delivered within the given MH budget

Ensure that any threat or lag in the progress of the workload is highlighted in time so mitigation measures can be adopted

Maintain the C Check workflow plans

Ensure it adapts to check or workload finding and impact on the critical path affected

Liaise with the Dock PPE / MSM or Workshop Manager and publish an agreed recovery plan

Ensure there is a plan in place for critical findings، that may impact parts release

Ensure all EER?s are reflected in the ETS dashboard and make necessary follow ups to get the EER responses on time

Provide estimation support to the production organisation ensuring a detailed understanding exists of the resources required to accomplish any maintenance activity

Ensure this database is updated regularly

Produce the annual manhour budget for the business، based on projected workloads and other business drivers

Ensure this is reviewed monthly to allow effective demand/ resource planning

Qualification To be considered for this role، you should meet the below

Bachelors in Engineering (Aeronautical، Mechanical or Electrical) or Engineering Licence

Good knowledge of aircraft systems، power plant and components

Thorough understanding of Aircraft Regulatory

and Aircraft Maintenance documents

Knowledge of MS Office applications i.e

Word، Excel and PowerPoint

Join our team of over 100، 000 people and follow your passions into one of over 50 brands in the Emirates Group

We’re led by our world-famous airline، Emirates، and our global air services provider، dnata

All our leading brands

We strive for exceptionally high standards in all the products and services we offer and we’ve built an admired global reputation because of it

Work with us to build exciting brands and progress your career in the Emirates Group

Further information on what’s it like to live and work in our cosmopolitan home city، can be found in the Dubai Lifestyle section.

Job Purpose

Emirates Engineering is one of the world's most technologically advanced aircraft maintenance facilities.

We also support the fleets of thirty other airlines through third-party maintenance contracts.

They manage and implement all aspects of maintenance، engineering، quality، planning and logistics.

And this has established our reputation for world-leading aircraft maintenance.

Provide leadership and guidance to their assigned team and actively participate in projects to improve the PPC process and deliverables.

In this role you will

Provide leadership and guidance to the planning officers and supervisors reporting to him/her.

Lead assigned projects to continuously improve the Production Planning Department and improve the service provided to Operations.

Continuously review with PPEs within other PPC areas for cross utilization of resources.

Preparation & Closure

Ensure all issues identified as part of the technical review process are followed up with the concerned departments and resolved prior to the start of each input.

Ensure the work package for each input is printed، segregated and complete as per agreed SLAs and quality standards prior to each maintenance input.

Ensure Co-Ordination with 3rd Parties or any internal department (like workshops/GSE/Docking/ETS) to alert them to the work that will be assigned to them based on published workflow plans for each input.

Dock Control

Manage the daily allocation of work to Production in conjunction with the Shift Manager and Resource planning team

Ensuring all tools، materials and resources are available to deliver the planned work and monitor resources to ensure the check is delivered within the given MH and material budgets.

Revise workflow plans as required to reflect critical findings and their impact on the critical path.

Ensure that any threat or lag in the progress of the check is highlighted in time so mitigation measures can be adopted.

Ensure there is a plan in place for these critical NRIs.

Oversee the audit of completed check work packs/cards and ensure the CRS is only released to production on confirmation all cards have been completed or deferred in accordance with the EPM.

Ensure reasons for deviation to plans and budget are understood and explained.

Act as key focal for all planning issues between operations and all other stakeholders during check execution including: FTM، Repairs Process، SDG، Aircraft Scheduling، Logistics، Facilities، Workshops، etc.

Check Planning

Conduct a work pack review of maintenance events، to ensure the following is identified: task intent، special

(jacking، defueling، repairs، shop input، test flights etc.) dependencies، materials required، tooling required، new supporting task cards required and any other information which will aid the planning process.

Ensure minimum ground time is identified & planned for each maintenance input.

Ensure all issues identified during these reviews are followed up and addressed before input.

Estimation

Produce detailed Man-hours estimate report for each input ensuring correctness and accuracy to support the workflow and manpower planning process.

Post each completed input review the man-hour analysis for correctness and accuracy to ensure technical integrity of the estimation database through continuous study of production performance in terms of clocking/ man-hour utilization.

Create `Facilitation Cards` as per work package requirement as well as per necessity of Production in terms of facility/check activity to support the planned maintenance execution.

Review engagement standards based on latest actual events، to forecast and prepare yearly man-hour budget for maintenance inputs.

Review fleet-wise defect analysis and trend monitoring to determine technical impact for future layovers in terms of Non-Routine estimation and manpower allocation taking into consideration check type، age، and in service issues.

Workshop

Provide guidance in the daily allocation of work to Production in conjunction with the Shift Manager/Shop Focal in order to meet the workflow milestones and targets

Ensure all tools، materials are available to deliver the planned work and monitor resources to ensure the workload is delivered within the given MH budget.

Ensure that any threat or lag in the progress of the workload is highlighted in time so mitigation measures can be adopted.

Liaise with the Dock PPE / MSM or Workshop Manager and publish an agreed recovery plan.

Ensure all EER?s are reflected in the ETS dashboard and make necessary follow ups to get the EER responses on time.

Ensure this database is updated regularly.

Ensure this is reviewed monthly to allow effective demand/ resource planning.

Qualification

To be considered for this role، you should meet the below

Experience in Aircraft Maintenance related activities or Production Planning at an airline or 3rd party Maintenance Facility.

Good knowledge of aircraft systems، power plant and components.

and Aircraft Maintenance documents.

Knowledge of MS Office applications i.e. Word، Excel and PowerPoint.

Knowledge of ULTRAMAIN is an advantage

Join our team of over 100، 000 people and follow your passions into one of over 50 brands in the Emirates Group.

We’re led by our world-famous airline، Emirates، and our global air services provider، dnata. All our leading brands

We strive for exceptionally high standards in all the products and services we offer and we’ve built an admired global reputation because of it.

Work with us to build exciting brands and progress your career in the Emirates Group.

Jobs Match Engine

Match & discovery analysis

Medium match; review skills and gaps before applying.

57% D
Clear listing New
Why it fits
  • Listing is clear and comprehensive.
  • Opportunity is highly fresh and active.
What to review
  • Use category/role filters to improve results.
  • Add a search keyword to measure text relevance.
Category & role 45%
Location 50%
Job type 55%
Skills & keywords 45%
Listing clarity 85%
Opportunity freshness 100%
Complete your resume for a sharper match Improve resume
Apply and contact

Choose an available method

Contact data supplied by the advertiser is presented clearly, following the previous site contract.

Contact available
Application readiness

Is this role right for you?

Review the quick signals before applying to improve your chances.

Location available Ask about salary Description available
Before applying

Apply with a clearer message

Write a short message that explains your experience and fit for the role.

  1. Review location, salary, and core requirements.
  2. Prepare a short message linked to the job and your experience.
  3. Apply through the available apply or contact button.
Next step

Sign in to apply without repeating your details

Your account helps you save jobs, track applications, and reuse your resume when applying.

  • Prepare a short message that connects your experience to the job.
  • Complete your resume so the employer sees a stronger profile.
Direct apply status

Direct apply is unavailable for this listing

The previous site internal-apply condition is not met. Use an available contact method or external link.

View available contact methods

Report this listing

Use this form if the listing is inaccurate, misleading, or contains inappropriate content.

Log in to report this listing

Logging in helps the review team follow up on your report when needed.

Login
Contact option available مجموعة طيران الإمارات (Emirates Group)
FAQ

Important questions before applying

Short answers that help job seekers understand the listing quickly.

How can I apply for Production Planning Engineer - III?

Review the job details, then use the available apply or contact button on the job page.

Where is this job located?

The job location is Emirates.

Is the salary listed?

The salary is not listed in the ad. You can ask about it when contacting or applying.

Do I need an account to apply?

An account helps you save jobs, track application status, and update your resume easily.

Career advice

Advice before applying

Selected articles to help you prepare your CV or application message for this job.

How to Write a Professional CV for Gulf Jobs A practical guide to preparing a CV for jobs in Saudi Arabia, Qatar, UAE, and the Gulf market. How to Answer: Tell Me About Yourself A simple structure to answer the most common interview question confidently. Best WhatsApp Message for Job Applications A professional short message structure for applying to jobs through WhatsApp.
Opportunities you may like

Similar opportunities

Browse opportunities
Job opportunity New 56% Match

Lead Operations Engineer - Web Application Security - L3

مجموعة طيران الإمارات (Emirates Group) Emirates

Job brief: Job Purpose At Emirates، we believe in connecting the world، to and through، our global hub in Dubai، and in constantly innovating to ensure our custo…

Posted2026-11-19 Openings1
LocationPosted date
Listing is clear and comprehensive.Opportunity is highly fresh and active.
Job opportunity New 56% Match

Engineering Repairs Coordinator - PPRS

مجموعة طيران الإمارات (Emirates Group) Emirates

Job brief: Job Purpose Emirates Engineering is one of the world's most technologically advanced aircraft maintenance facilities

Posted2026-11-19 Openings1
LocationPosted date
Listing is clear and comprehensive.Opportunity is highly fresh and active.
Job opportunity New

مستشارة عرائس – دبي

ذا برايدل أتيليه Emirates

Job brief: تفاصيل الوظيفةالمهام والمسؤوليات

Posted2026-11-19 Openings1
LocationPosted date
Opportunity is highly fresh and active.
Job opportunity New

مساعد قانوني – دبي

فوتيس الدولية للمحاماة Emirates

Job brief: تفاصيل الوظيفةالمهام والمسؤوليات

Posted2026-11-19 Openings1
LocationPosted date
Opportunity is highly fresh and active.
Job opportunity New

حارس أمن – الشارقة

مجموعة الميزان Emirates

Job brief: تفاصيل الوظيفةالوظائف المتاحة

Posted2026-11-19 Openings1
LocationPosted date
Opportunity is highly fresh and active.
Job opportunity New

وسيط عقاري – دبي

بيكون كابيتال Emirates

Job brief: تفاصيل الوظيفةالمهام والمسؤوليات

Posted2026-11-19 Openings1
LocationPosted date
Opportunity is highly fresh and active.
Search quality

Search paths related to this job

If "Production Planning Engineer - III" is not the right fit, use these links to find nearby opportunities by country, city or field.